Monday, 7 January 2008

EDAW Landscape Architecture

I chose to investigate EDAW as I wanted to learn more about larger more internationally recognised Landscape firms, I wanted to understand how such a large organisation composed of so many different disciplines would work. Also I wanted to get an insight into the development of such large scale projects as the Olympic regeneration schemes.



EDAW Europe is made up of three branches which are Edinburgh, Manchester and London. As one of the worlds largest landscape architecture firms EDAW try to bring together different disciplines and technologies and also take into account environmental issues so as to come up with sustainable solutions.

Some of the disciplines included are:

- Urban Design and Revitalization
- Landscape Architecture
- Community Planning
- Ecological and Environmental Sciences
- Resource Management and Planning
- Environmental Impact Assessment and Permitting
- Economics and Applied Social Science
- Information Technology




Parc Diagonal Mar


Client: Hines/Diagonal Mar



One of the main projects that EDAW have accomplished is The Diagonal Mar beach front in Barcelona.
The park provides a gateway to the sea for locals and visitors with features such as play areas, lakes, a waterfall, cafes and viewing mounds that are all linked and lead to the beach. The park is conceived as an abstract tapestry from plan view and can be viewed from the high-rise buildings that surround the park. Ecology played a meaningful role in the parks design, the use of native plant materials along and a natural retention pond provide habitats for indigenous marine and bird species.
Diagonal Mar (the Diagonal seafront district), a new district has sprung up and recently become an integral part of the Barcelona city. The district consists of residential areas, hotels and a modern shopping complex, as well as the new Centre Internacional de Convencions (International Convention Centre). The auditorium can host up to 3,200 people, making it the largest capacity conference facility in southern of Europe. The key element in the area is the Diagonal Mar Park, not just because of its 14 hectare site, but due to its design and characteristics.
The park combines the element of water with plants and a series of tubular structures on different levels almost like a large-scale play area. The 36 million-euro park is the third largest in Barcelona. This was the site of the first Universal Forum of Cultures held in 2004, involving debates, themed exhibitions and the World Festival of the Arts. By hosting this international event, it gave Barcelona a chance to revitalize decaying parts of the city infrastructure. The land was an ex-industrial district. Diagonal Mar Park is a large urban redevelopment project centered on Barcelona’s famous ‘Avenue Diagonal’ near where the avenue meets the sea. Diagonal-Mar Park is not the typical urban park with trees, lush lawns and colorful flower beds. It was designed as an open space that acts as a link, a gateway, between the city and the Mediterranean. It symbolizes a tree that was born from the sea and that branches out into an open hand, representing the different paths that we humans walk throughout our lives. The architects carried out a photographic survey of the area that provided a record of habitual imagery and an action register (for example ‘graffiti’ and ‘skating’), and revealed generic construction elements, such as cheap decorative ceramic. Artificial puddles, suggestive of local irrigation systems, are given a naturalistic appearance through a sprinkler system that stimulates intermittent rain. Cast concrete elements resembling graffiti, hung at a high level, which provide sheltered routes, compensating for the absence of trees.
The Diagonal Mar Park is also viewed by some as an urban development disaster, although ironically winning an Urban Land Institute Award for Excellence. Criticism of the park stems from its perceived lack of human use and its barren surroundings.












Picadilly Gardens


Client: Manchester City Council


EDAW was chosen by international design competition to design the new Piccadilly Gardens which was to be the centrepiece of a wider generation scheme that included the 1960’s Piccadilly Plaza, the gardens are now the largest public open space in Manchester.
The gardens central lawns are enclosed within landscaped forms. The centre of the site is activated by an elliptical fountain plaza which acts as a meeting place for people and also as a link to the adjacent streets. The design also includes a dramatic wall mirroring the ellipse shape of the central fountain designed by Tadao Ando.


Royal Victoria Square

Client: London Docklands Development Corporation


The Royal Victoria was redesigned by EDAW to reflect a contemporary interpretation of the areas identity as a working industrial dock. Two large canopies form a covered passageway to the main entrance of the exhibition centre. Water features and lighting are used to animate the plaza, routes bordered by trees direct pedestrians from the bridge to the station.
























Olympic Park Design and Site-Wide Infrastructure


Client: Olympic Delivery Authority


One of the main reasons for choosing EDAW was because of their involvement in the Olympic Park regeneration program of the Lower Lea Valley in East London. Because this would give me the possibility of visiting the site.
Part of what is most interesting about this project by EDAW is so many groups of people brought together urban designers, landscape architects, town planners, and engineers all contribute to the development of the master plan. The team will work with the Interim Olympic Delivery Authority to further develop the Olympic Park master plan and begin to design all the infrastructure elements that will make up the Park, including utilities, waterways, drainage, landscape, roads and bridges.

































Black Law Windfarm


Client: ScottishPower UK




Part of why I chose to investigate EDAW was because a lot of their projects take on environmental issues such as sustainable energy systems and how to adapt these into our landscapes. EDAW were commissioned by ScottishPower UK to come up with landscape and visual assessments for a proposed windfarm on a former coalmine site near Climpy in Lancashire. EDAW’s main participation for this project was to peform consultation exercises in local communities and come up with ways of showing and explaining new ideas and proposals to the general public. The windfarm now consists of 62 turbines and became operational in 2005.


(pictures from google images)